Erratum: Correcting a proof in "Economic lot-sizing with remanufacturing options" (IIE Transactions)

Boaz Golany, Jian Yang, Gang Yu

Research output: Contribution to journalComment/debate

Original languageEnglish
Pages (from-to)787
Number of pages1
JournalIIE Transactions (Institute of Industrial Engineers)
Volume37
Issue number8
DOIs
StatePublished - Aug 2005

ASJC Scopus subject areas

  • Industrial and Manufacturing Engineering

Cite this